Shipbuilding. Energy. Transport

On-line supplement
to the Maritime Market magazine

Shipbuilding. Energy. Transport Maritime Market magazine
Russian
Contacts
Search

Press Release

The “Samur River”, the sixth tanker of the project RST22 built by Krasnoye Sormovo Shipyard passed the sea trials

Nizhniy Novgorod, April, 30, 2009. The tanker was launched on 28 March 2009 being sent for sea trials on 28 April 2009. The tanker will be delivered to the customer on 20 May 2009.

Specifications: length overall - 139.95 m, beam - 16.60 m, hull height - 6 m, deadweight in sea - about 7000 tons with the draft of 4.60 m, in river - 4700 tons with the draft of 3.60 m, capacity of six cargo tanks and two slop tanks - 8090 cubic meters, capacity of main propulsion engine - 2x120 kW, operating speed - 10.5 knots.

Class of the tanker is - KM*ËÓ1 II À1 EKO Project of the Russian Maritime Register of Shipping. The design was worked out by Marine Engineering Bureau (Odessa, Ukraine). Vessels obtain additional sign in the class symbol - EKO Project. This sign is indicative of additional requirements for pollution prevention at accidents. Environmentally safe vessels find credence of freight owners, maritime administration and port authorities.


2009-05-06

Please see MNP Group company electronic office

MNP Group incorporates: Krasnoye Sormovo Shipyard, Volgo-Caspian Design Bureau, as well as Sormovskoye Mashinostroeniye (Nizhniy Novgorod).

Company press releases




Please contact us if you require further information about press release and advertising publishing on our web site.
Phone: +7 (812) 336 3130, e-mail: info@setcorp.ru

© 1998-2023, Print-Expo Co. Ltd., all rights reserved.

RSS ßíäåêñ.Ìåòðèêà Up