Судостроение. Энергетика. Транспорт

Он-лайн приложение к журналу
«Морская биржа»

Судостроение. Энергетика. Транспорт Журнал ''Морская биржа''
English
Контакты
Поиск

Пресс-релиз

Jumbo successfully installs another mooring system in Egypt!

The Fairplayer and her team have successfully completed the pre-installation and tensioning of a shallow water CALM buoy mooring system at a depth of 26 metres for the Mersa El-Hamra terminal offshore Egypt.

Scope of Work
Jumbo’s scope included the pre-lay of 10 Stevshark drag anchors and 6 chain moorings and the subsequent tensioning of the mooring legs up to 512 tonnes, for our client WEPCO / Micoperi.

Planning & Preparation
With a short lead time, the project team managed to professionally prepare for the full scope of work and provide the required project procedures, equipment and personnel on-time.

Jumbo would like to thank the specialised teams who contributed towards making this project possible. We look forward to our next offshore mooring installation!


02.07.2019




По вопросам размещение пресс-релизов и рекламы обращайтесь по тел.: +7 (812) 336-31-30, e-mail: info@setcorp.ru

© 1998-2019, ООО «Принт-Экспо», все права защищены.

RSS Яндекс.Метрика Наверх